Aperçu avant impression Fermer

Affichage de 3588 résultats

Objet d'information
8 résultats avec objets numériques Afficher les résultats avec des objets numériques
CA ON00411 MG-0002-5-96-26-13 · Pièce · ca. 1939-1995
Fait partie de Shephard Fonds

Table of Contents includes: Introduction; OBOE calibration Errors; Computer 53 Faults; Instantaneous Velocity MOUSE Faults; Instability of Ground Station Settings; Operational Errors at Ground Stations; Flying Errors; Bombs Hanging Up; Causes of Smaller Errors; Variation of Delay with signal Strength; Delay Measuring and Checking Vans; Crystal Frequencies; Non-linearity of Time Base; Propagation; Conclusion. Item is referenced as Report No. M 152.

CA ON00411 MG-0002-5-96-26-12 · Pièce · June 21, 1944
Fait partie de Shephard Fonds

Table of Contents includes: Introduction; Recent Operational Results; OBOE Calibration Errors; Causes of Large Errors; Mouse- Computer 53; Instantaneous Velocity Measuring Mouse; Instability of Ground Station Settings; Operational Errors at Ground Stations; Faulty Computation of Target Changes and Corrections; Aircrew Errors; Crystal Frequencies; Propagation; General; Reliability; Ballistics of T.I.s;Summary of Conclusions; Summary of Principal Recommendations. Item is referenced as Report No. M 151.

CA ON00411 MG-0002-5-96-26-10 · Pièce · October 6, 1943
Fait partie de Shephard Fonds

Table of Contents includes: Introduction; Effective Weight of Attack; Mean Area of Effectiveness; Determination of the Proportion of the Target Visibly Damaged; Reliability of the Result; Conclusions. Item is referenced as Report No. 81.

CA ON00411 MG-0002-5-96-26-1 · Pièce · ca. 1939-1995
Fait partie de Shephard Fonds

Table of Contents includes: Introduction; The Major Characteristics of Distribution Error; Effective Average Error; Value of Effective Average Error as a Practical Assessment Measure; Method of Computation; Computing Effective Average Error; Computing Gross Errors; Remarking on Large Errors; Treatment in Height Bands; Summary for Publication. Item is referenced as Report No. M 13.

CA ON00411 MG-0002-5-95-25-5 · Pièce · March 19, 1944
Fait partie de Shephard Fonds

Table of Contents includes: Summary; The Attack; Results; Bomb Distribution; Gross Errors; Systematic Errors; Random Errors. Attachment: Herbouville- January 27/28th & 29/30th 1944 Crater Plot. Item is referenced as Report No. S. 127.

CA ON00411 MG-0002-5-95-25-4 · Pièce · March 7, 1944
Fait partie de Shephard Fonds

Table of Contents includes: Summary; Data Available; Attacks By Marauders Only; Attacks By Venturas and Mitchells of Fighter Command; Attacks of Fighter Bombers of Fighter Command; Attacks by Aircraft of Bomber Command. Item is referenced as Report No. S. 126, AWAS No. 52.

CA ON00411 MG-0002-5-95-25-29 · Pièce · December 30, 1944
Fait partie de Shephard Fonds

Table of Contents includes: Introduction; Conclusions and Recommendations; General; Summary of the Data; Serviceability; Location and Duration of Pronounced Interference; Manipulation Difficulties; Western Limit of Service Area. Item is referenced as Report No. S. 198.

CA ON00411 MG-0002-5-95-25-25 · Pièce · August 21, 1944
Fait partie de Shephard Fonds

Table of Contents includes: Summary; Operational Record; Types of initial Contact; Type of Patrol; I.F.F; Interference on A.I Mk. IV; Use of the Serrate aircraft during "Spoof" operations; Serviceability; Future Developments.Item is referenced as Report No. S. 173.

CA ON00411 MG-0002-5-95-25-24 · Pièce · August 12, 1944
Fait partie de Shephard Fonds

Table of Contents includes: Summary; Purpose of the Mandrel Screen and of the Special Window Force; Ther Mandrel Screen; Special Window Force; Method of Assessment of Effectiveness of Mandrel Screen and Window Force; Number of Occasions on Which the Mandrel Screen and the Special Window Force have been Used; Effects Produced by the Mandrel Screen; Effects Produced by the Special Window Force; Future Development. Attached is a report on Consideration of Individual Operations: Operations on 16/17th June, 17/18th June and 20/21st June; Operations for 22/23rd of June to 17/18th July; Operations from 18/19 to 21/22 July; Operations from 23/24 to 25/26 July. Item is referenced as Report No. S. 172.